Trails in Tauranga
107 trailsShowing 73–96
Rollercoaster
OpenAdvancedMountain bikingOropi GroveDogs allowed302m
SRAM Track
OpenIntermediateMountain biking10 minSummerhill Recreational TrailsDogs allowed2.3km
86 m climb
SRAM easy entry
OpenIntermediateMountain biking59 secSummerhill Recreational TrailsDogs allowed279m
Salt Marsh Track
OpenEasiestMountain biking4 minTauranga City TrailsDogs allowed4.8km
70 m climb
Section 1 - Omokoroa Esplanade to Tinopai Reserve
OpenEasiestMountain biking22 minOmokoroa TrailsDogs allowedSection 1 (COMPLETE)Length 2050m Construction type - on-road and existing gravel track, some timber boardwalk The Omokoroa to Tauranga walkway/cycleway commences at the south end of The Esplanade, near the picturesque Omokoroa Beach. It runs along an existing track via Cooney Reserve to Tinopai Reserve which includes a recently completed boardwalk and widened gravel path.
2.0km
31 m climb
Section 10/11 - Bridge 3 to Newnham Road
OpenEasiestMountain biking2 minOmokoroa TrailsDogs allowedSection 11 (COMPLETED)Length - 500m Construction type - Compacted metal & chip-seal This section runs from the south end of bridge 3, beside the railway embankment to the unformed end of Newnham Road before connecting to the formed and sealed portion of Newnham Road. There is an off-road grass carpark at the end of Newnham Road. Ultra-Fast Fibre and future power supply infrastructure has been installed along this section to supply future needs for growing communities. A "boulevard" of flowering cherry trees and some fruit trees has also been planted along the route to enhance this section in the years to come. Further trees and plantings are planned.
722m
Section 2 - Tinopai Reserve to Lynley Park
OpenEasiestMountain biking4 minOmokoroa TrailsDogs allowedSection 2 (COMPLETE)Length - 1690m Construction type - Timber-edged gravel track, boardwalk and timber bridge The trail runs alongside the harbour between Tinopai Reserve and Lynley Park, providing stunning views and the opportunity to see local birdlife. This section was officially opened in July 2017.
1.0km
12 m climb
Section 4/5 - Railway (Tamihana Park) to bridge 1 - Across Mangawhai Creek
OpenEasiestMountain biking1 minOmokoroa TrailsDogs allowedSection 4 (COMPLETED)Length - 250m Construction type - Compacted metal 19 JULY UPDATE: Repairs have been completed and this plus sections 5 and 6 officially opens 20 July, 10am at the end of Lynley Park Drive. This section begins at the new Tamihana Park and runs along the base of the railway embankment, ending at bridge 1 at the Mangawhai Estuary. Section 5 (COMPLETE)Length - 50m Construction type - Concrete path on bridge19 JULY 2019 UPDATE: The bridge is being formally opened 20 July 10am at the end of Lynley Park Drive. Safety fencing/handrails at each of the bridge approaches will be completed by mid August.
556m
Section 6 - Bridge 1 to Huharua Park
OpenEasiestMountain biking2 minOmokoroa TrailsDogs allowedSection 6 (COMPLETED )Length - 760m Construction type - Compacted metal and concrete path Starting at the southern end of the new bridge, section 6 follows the harbour's edge and esplanade reserve until it reaches Huharua Park, Plummers Point. Construction (nearly complete) has included cutting a new bench-line through the steeper ground in front of the Pats Lane community to provide a more gentle gradient through this section as well as provide some screening to the close residential properties. Surplus earth removed has been used to help form the trail along this stretch of shoreline. The small bridge installed to link the esplanade reserve with Huharua Park has been temporarily removed for erosion repairs and will be reinstalled once the trail is ready to open. Construction is expected to be completed between April and June 2019 but won't be officially opened until Section 4 has been finished.
741m
Section 6A - Shortcut to Plumers Point Rd
OpenEasiestMountain biking1 minOmokoroa TrailsDogs allowedConstruction type - compacted metal This section provides a shorter more direct route to Plummers Point Road and has been enabled through a private property subdivision beside the railway. This section is being formally opened 20 July 2019 10am at the end of Lynley Park Drive. NOTE: Planting will be completed over the next few weeks.
450m
7 m climb
Section 7 - Huharua Park
OpenEasiestMountain biking2 minOmokoroa TrailsDogs allowedSection 7 (COMPLETE)Length - 570m Construction type - Existing concrete path Public toilets available Owned jointly by Western Bay and Tauranga City councils, Huharua Park was purchased as a passive harbourside reserve for the enjoyment of public in the wider sub region of Tauranga and Western Bay of Plenty. Located within the Western Bay District, the park falls under the administration of our Council as the lead authority. Tangata Whenua, Pirirakau Hapu, has played a major role in the development of Huharua Park from Council's initial purchase in 2004 to their ongoing involvement including the Marae DIY project in 2010.
7m
44 m climb
Section 8 - Plummer's Point Road
OpenEasiestMountain biking6 minOmokoroa TrailsDogs allowedSection 8 (COMPLETE)Length - 1890m Construction type - Sealed road Public toilets available nearby at Kotuku Reserve This section is entirely on road and offers riders and walkers views over the Te Puna West settlement and down the harbour towards Mt Maunganui.
2.1km
13 m climb
Section 9 - Jess Road to Kiwirail bridge
OpenEasiestMountain biking3 minOmokoroa TrailsDogs allowedSection 9 (COMPLETED)Length - 945m Construction type - Compacted metal along wetland and chip-seal path over the Jess Road hump After leaving Plummer's Point Road, the route follows Jess Road briefly before entering the Department of Conservation wetland area and following a stop-bank. This section includes bridge 2 which was completed in March 2018.
897m
13 m climb
Shell Shock
OpenAdvancedMountain bikingOropi GroveDogs allowed344m
1 m climb
Shortcut up to Pines Climb
OpenAdvancedMountain bikingOropi GroveDogs allowed266m
14 m climb
Smooth Operator
ClosedIntermediateMountain bikingSummerhill Recreational TrailsDogs allowed775m
9 m climb
Switchbacks
OpenIntermediateMountain bikingOropi GroveDogs allowed651m
11 m climb
Switchbacks Link
OpenEasyMountain bikingOropi GroveDogs allowed626m
12 m climb
Takitimu Dr Over Bridge
OpenEasyMountain biking1 minTauranga City TrailsDogs allowed479m
Tauranga Waterways - Longview to Parton (N side)
OpenEasyMountain bikingTauranga City TrailsDogs allowed1.3km
4 m climb
The Bomb
OpenVery difficultMountain bikingOropi GroveDogs allowed493m
1 m climb
Three Bridges
OpenIntermediateMountain bikingSummerhill Recreational TrailsDogs allowed383m
10 m climb
Trail Mix
OpenAdvancedMountain bikingOropi GroveDogs allowed363m
1 m climb
Uno
OpenEasyMountain biking10 minTECT All Terrain ParkDogs allowedA nice little meandering track. Family friendly, not too long or technical, but higher grade riders will still enjoy this trail at speed.
1.9km
36 m climb