Section 10/11 - Bridge 3 to Newnham Road
- Distance
- 722m
- Time
- 2min
- Climb
- 0m
- High point
- 23m
- Difficulty
- Easiest
Elevation
0 m up-18 m down
-0 m10 m
0 km363 m726 m
About
Section 11 (COMPLETED)Length - 500m Construction type - Compacted metal & chip-seal This section runs from the south end of bridge 3, beside the railway embankment to the unformed end of Newnham Road before connecting to the formed and sealed portion of Newnham Road. There is an off-road grass carpark at the end of Newnham Road. Ultra-Fast Fibre and future power supply infrastructure has been installed along this section to supply future needs for growing communities. A "boulevard" of flowering cherry trees and some fruit trees has also been planted along the route to enhance this section in the years to come. Further trees and plantings are planned.
Reviews
No ratings yet. Be the first to rate this trail.
Nearby trails
Section 9 - Jess Road to Kiwirail bridge
Easiest · 897 m · 657m away
Section 8 - Plummer's Point Road
Easiest · 2.1 km · 1.4 km away
Section 6A - Shortcut to Plumers Point Rd
Easiest · 450 m · 1.7 km away
Section 6 - Bridge 1 to Huharua Park
Easiest · 741 m · 2.1 km away
Section 4/5 - Railway (Tamihana Park) to bridge 1 - Across Mangawhai Creek
Easiest · 556 m · 2.1 km away
Section 7 - Huharua Park
Easiest · 7 m · 2.2 km away
Nearby public access areas
Join OpenTrails
Create a free account to save your favourite trails, leave reviews, and track your rides.