Otonga Track Up Mountain Bike Trail
Status
OPEN
Difficulty
Intermediate
Distance
4.9 km
Elevation
639m
-235m
Rating
Description
This is a new remodeled walking track built by the local Park Ranger and volunteers. This can be used for MTBing but uphill only, from what i can gather from the signs, this a one of the trails that leads up from the Korokoro Dam after finishing the Korokoro Dam/Cornish Street trail. They are currently repairing/remodelling the other uphill track"Oakleigh Street" "which will be finish on the 17th May 2017". The track in it's self is a steady up hill climb with some tricky switch backs at the start which take some technique to negotiate without stopping. It get "easier" as the track progresses. Keep on the lookout for other track users thou.The surface is small gravel chip on top of clay. All weather durable.
Weather
Details
Condition
Ideal
Dogs
Allowed
Physical rating
Hard
Grade
8.3% avg, -44.7% max
Altitude range
243m to 650m
Region
Belmont Regional ParkLast updated
26 Mar 2026
Links
No links, yet!
Trail features
Bridge
Frequently asked questions
Explore this trail
View Otonga Track Up on the interactive map to see the full trail route and nearby trails.