Main Line

OpenMountain bike trail
Directions
Distance
987m
Climb
6m
High point
66m
Difficulty
Easy

Elevation

6 m up-7 m down
63 m64 m65 m66 m
0 km494 m988 m

About

Follows the Oroua River downstream beginning in the willows under the Aorangi Bridge. Currently an out-and-back trail under development, the intention is to eventually link to Awahuri Forest Park. Drains well after rain, a pleasant sheltered trail easy on the legs and suitable for most riders.

Reviews

No ratings yet. Be the first to rate this trail.

Join OpenTrails

Create a free account to save your favourite trails, leave reviews, and track your rides.